Serves Chesapeake
Dominion Energy Virginia
- Average home rate (2024)
- 14.09¢/kWh
- Paid for exported solar
- credited one-for-one at retail against your own annual usage
- Net-metered home solar, utility-wide
- 53,368
Commercial solar · Chesapeake, VA
Commercial solar in Chesapeake is sized to daytime load: a business on Dominion Energy at an average 14.1¢ per kWh uses most of its output on site, which is where the value is.
Why the numbers favour business · as of August 2026
Dominion Energy Virginia credits exported power at credited one-for-one at retail against your own annual usage against the applicable residential retail rate, confirmed against your own bill rate, so the value sits in consuming your own production. A Chesapeake business that runs through daylight hours self-consumes most of what it generates, which is exactly what the current net energy metering under §56-594 structure rewards. That is a structural advantage over a typical home.
Looking for a solar company in Chesapeake? See solar companies in Chesapeake: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local commercial reality
Chesapeake is geographically large enough that its commercial stock varies more than most cities on one tariff. There is modern distribution and light industrial near the corridors, older commercial toward the historic areas, and genuinely rural buildings in the south of the city.
Coastal wind loading raises the structural documentation requirement above inland Virginia on every one of them, and the lower-lying areas bring flood-zone considerations into where inverters and switchgear can sit. Virginia caps non-residential net metering at 100 kW, which is usually what shapes the design rather than roof area.
Written for Chesapeake specifically.
How we work
We start from interval data and the Dominion Energy tariff, then check roof structure and service capacity against coastal wind loading before quoting a size.
How we scope a building
Your Dominion Energy Virginia interval data and tariff, read before anything is sized.
Low-slope membrane, standing-seam metal or ballasted, plus service capacity and switchgear. Coastal. Salt air and hurricane wind loading both apply, so attachment spacing, fastener specification and roof-penetration detailing are more demanding than inland and the correct hardware costs more than the catalogue default. This is the same engineering we do in Charleston and Savannah, and every penetration is backed by our lifetime roof-penetration warranty.
Building and electrical permits with plan review, structural sign-off, and Dominion Energy Virginia interconnection.
Sequenced around your operations, then City of Chesapeake (independent city) inspection and monitoring handover.
Commercial systems carry our lifetime full-system and roof-penetration warranty alongside manufacturer coverage, so one contractor stands behind the roof and the array.
Chesapeake specifics
The constraints that actually shape a Chesapeake commercial design.
Coastal. Salt air and hurricane wind loading both apply, so attachment spacing, fastener specification and roof-penetration detailing are more demanding than inland and the correct hardware costs more than the catalogue default. This is the same engineering we do in Charleston and Savannah, and every penetration is backed by our lifetime roof-penetration warranty.
Dominion Energy Virginia approval precedes energising, and the queue rather than the install usually sets your date.
Chesapeake is an independent city issuing its own permits, and it is geographically large enough that conditions differ substantially across it. Coastal wind loading applies, and low-lying areas bring flood-zone considerations into equipment placement. Under SB 686 the property-tax exemption for residential systems of 25 kW or less has been mandatory statewide since 1 January 2023, so for a typical rooftop system the local ordinance question does not arise. Above that capacity it does, and the answer is the locality’s own. Under SB 504 an association may impose only reasonable restrictions on rooftop solar, unreasonable being a cost increase above 5% or a generation loss above 10%.
Tax
We build and document a Chesapeake system for your CPA; Virginia commercial tax treatment depends on your entity, so it is theirs to call.
Permits and approvals
6 approvals for a Chesapeake system. We file every one.
Standing monthly charge:about $1 a month for customers connecting under NEM 2.0, included in our payback figures.
Local factors
Chesapeake spans open suburban development and heavily wooded areas toward the south of the city, so shading varies far more than in a uniform market.
Chesapeake is an independent city issuing its own permits, and it is geographically large enough that conditions differ substantially across it. Coastal wind loading applies, and low-lying areas bring flood-zone considerations into equipment placement. Under SB 686 the property-tax exemption for residential systems of 25 kW or less has been mandatory statewide since 1 January 2023, so for a typical rooftop system the local ordinance question does not arise. Above that capacity it does, and the answer is the locality’s own. Under SB 504 an association may impose only reasonable restrictions on rooftop solar, unreasonable being a cost increase above 5% or a generation loss above 10%.
Hot humid summers with cooling load peaking alongside production, a genuine hurricane and nor’easter exposure, and flood-zone considerations across much of the region. Storm outages are a real planning input here rather than a sales line.
Your utility decides payback
Your utility sets what exported power is worth, which shapes the right system size more than any panel choice.
Serves Chesapeake
For comparison: Virginia average 14.41¢ · U.S. average 16.48¢. Virginia had 69,553 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of August 2026.
Chesapeake sun, month by month
About 12,830 kWh a year from a south-facing roof with no shade. May is the strongest month at about 1,259 kWh and December the weakest at about 751 kWh.
Your roof will differ. Chesapeake spans open suburban development and heavily wooded areas toward the south of the city, so shading varies far more than in a uniform market.
Estimate: NASA POWER sun data for Chesapeake, PVWatts model, south-facing, no shade.
Our work
Our own job photos, not stock or renders. Coastal.






Photo locations are not published.
Free assessment · Chesapeake, VA
We read your bill, confirm your Dominion Energy Virginia export terms, and tell you what your roof in City of Chesapeake (independent city) will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Chesapeake commercial solar FAQ
Often yes, for a structural reason. Dominion Energy Virginia credits exported power at credited one-for-one at retail against your own annual usage against the applicable residential retail rate, confirmed against your own bill, so the value is in consuming your own production. A business that operates through daylight hours self-consumes most of what it generates, which is precisely what the current net energy metering under §56-594 structure rewards.
A building permit and an electrical permit, with standard plan review for systems of roughly 10 kW and above, which covers essentially all commercial work. Coastal. Salt air and hurricane wind loading both apply, so attachment spacing, fastener specification and roof-penetration detailing are more demanding than inland and the correct hardware costs more than the catalogue default. This is the same engineering we do in Charleston and Savannah, and every penetration is backed by our lifetime roof-penetration warranty. Dominion Energy Virginia interconnection approval is required before energising.
It is sized to the building's daytime load rather than to the roof. Each kW here makes about 1,351 kWh a year unshaded, so a 50 kW array makes roughly 67,500 kWh. Dominion Energy households paid about 14.1¢ per kWh on average in 2024.
Yes. A building permit and a separate electrical permit from the city; Coastal wind-load documentation, which is more demanding here than inland Virginia. We pull all of it through City of Chesapeake (independent city).
Dominion Energy households paid about 14.1¢ per kWh on average in 2024. A 100 kW array in Chesapeake makes roughly 135,000 kWh a year; the share used on site is worth the retail rate, exports earn credited one-for-one at retail against your own annual usage.
Nearby
Free, no-pressure assessment
We will read your interval data and tariff, review your roof structure and service capacity, and give you an honest scope, with no guaranteed-savings math.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.