Most addresses
Dominion Energy Virginia
- Average home rate (2024)
- 14.09¢/kWh
- Paid for exported solar
- credited one-for-one at retail against your own annual usage
- Net-metered home solar, utility-wide
- 53,368
Commercial solar · Sterling, VA
Commercial solar in Sterling is sized to daytime load: a business on Dominion Energy at an average 14.1¢ per kWh uses most of its output on site, which is where the value is.
Why the numbers favour business · as of August 2026
Dominion Energy Virginia credits exported power at credited one-for-one at retail against your own annual usage against the applicable residential retail rate, confirmed against your own bill rate, so the value sits in consuming your own production. A Sterling business that runs through daylight hours self-consumes most of what it generates, which is exactly what the current net energy metering under §56-594 structure rewards. That is a structural advantage over a typical home.
Looking for a solar company in Sterling? See solar companies in Sterling: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local commercial reality
Sterling has more light industrial and flex space than the rest of Loudoun, and that stock is well suited to solar: large low-slope roofs, predictable structure, and the electrical service as the usual constraint rather than the roof.
The 100 kW non-residential net metering cap is the number that shapes most designs here. Under retail crediting a building captures full value whether it consumes its own production or exports it, so the analysis turns on demand charges and peak coincidence rather than on self-consumption.
Written for Sterling specifically.
How we work
We start from interval data and the Dominion Energy tariff, then check roof structure and service capacity before quoting a size.
How we scope a building
Your Dominion Energy Virginia interval data and tariff, read before anything is sized.
Low-slope membrane, standing-seam metal or ballasted, plus service capacity and switchgear. Inland Mid-Atlantic. No salt exposure, snow loading a real racking input, and a housing stock spanning several decades so roof age varies more here than in the master-planned communities.
Building and electrical permits with plan review, structural sign-off, and Dominion Energy Virginia interconnection.
Sequenced around your operations, then Loudoun County inspection and monitoring handover.
Commercial systems carry our lifetime full-system and roof-penetration warranty alongside manufacturer coverage, so one contractor stands behind the roof and the array.
Sterling specifics
The constraints that actually shape a Sterling commercial design.
Inland Mid-Atlantic. No salt exposure, snow loading a real racking input, and a housing stock spanning several decades so roof age varies more here than in the master-planned communities.
Dominion Energy Virginia approval precedes energising, and the queue rather than the install usually sets your date.
Loudoun County has adopted a solar equipment tax exemption, and the terms are worth knowing before you apply: the amount and duration are tied to the system’s nameplate capacity in DC watts, the equipment must be certified by the county as used primarily for collecting or generating energy, and the county will not process an application until the system is operating and has passed all required permits. Under SB 504 a Virginia association may impose only reasonable restrictions on rooftop solar, unreasonable being a cost increase above 5% or a generation loss above 10%.
Tax
We build and document a Sterling system for your CPA; Virginia commercial tax treatment depends on your entity, so it is theirs to call.
Permits and approvals
6 approvals for a Sterling system. We file every one.
Standing monthly charge:about $1 a month for customers connecting under NEM 2.0, included in our payback figures.
Local factors
A mix of established neighbourhoods with mature trees and newer open development, decided street by street rather than across the whole area.
Loudoun County has adopted a solar equipment tax exemption, and the terms are worth knowing before you apply: the amount and duration are tied to the system’s nameplate capacity in DC watts, the equipment must be certified by the county as used primarily for collecting or generating energy, and the county will not process an application until the system is operating and has passed all required permits. Under SB 504 a Virginia association may impose only reasonable restrictions on rooftop solar, unreasonable being a cost increase above 5% or a generation loss above 10%.
Four genuine seasons, with summer cooling peaks aligned to peak production and lower winter output. Retail net metering smooths that across the year in a way an export-credit state cannot, which is the main reason a Loudoun system behaves better than its latitude suggests.
Your utility decides payback
Dominion Energy Virginia and NOVEC split Sterling street by street. We read yours off your bill first.
Most addresses
Some addresses
For comparison: Virginia average 14.41¢ · U.S. average 16.48¢. Virginia had 69,553 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of August 2026.
Sterling sun, month by month
About 11,600 kWh a year from a south-facing roof with no shade. July is the strongest month at about 1,226 kWh and December the weakest at about 593 kWh.
Your roof will differ. A mix of established neighbourhoods with mature trees and newer open development, decided street by street rather than across the whole area.
Estimate: NASA POWER sun data for Sterling, PVWatts model, south-facing, no shade.
Our work
Our own job photos, not stock or renders. Inland Mid-Atlantic.






Photo locations are not published.
Free assessment · Sterling, VA
We read your bill, confirm your Dominion Energy Virginia export terms, and tell you what your roof in Loudoun County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Sterling commercial solar FAQ
Often yes, for a structural reason. Dominion Energy Virginia credits exported power at credited one-for-one at retail against your own annual usage against the applicable residential retail rate, confirmed against your own bill, so the value is in consuming your own production. A business that operates through daylight hours self-consumes most of what it generates, which is precisely what the current net energy metering under §56-594 structure rewards.
A building permit and an electrical permit, with standard plan review for systems of roughly 10 kW and above, which covers essentially all commercial work. Inland Mid-Atlantic. No salt exposure, snow loading a real racking input, and a housing stock spanning several decades so roof age varies more here than in the master-planned communities. Dominion Energy Virginia interconnection approval is required before energising.
It is sized to the building's daytime load rather than to the roof. Each kW here makes about 1,221 kWh a year unshaded, so a 50 kW array makes roughly 61,100 kWh. Dominion Energy households paid about 14.1¢ per kWh on average in 2024.
Yes. A building permit and a separate electrical permit from Loudoun County, or from the town where the address sits inside one; An interconnection application to whichever utility serves your meter, Dominion Energy Virginia or NOVEC, on that utility’s own forms. We pull all of it through Loudoun County.
Dominion Energy households paid about 14.1¢ per kWh on average in 2024. A 100 kW array in Sterling makes roughly 122,000 kWh a year; the share used on site is worth the retail rate, exports earn credited one-for-one at retail against your own annual usage.
Nearby
Free, no-pressure assessment
We will read your interval data and tariff, review your roof structure and service capacity, and give you an honest scope, with no guaranteed-savings math.