EV charging · Ashburn, VA

EV charger installation in Ashburn, VA

EV charger installation in Ashburn usually means a Level 2 circuit on Dominion Energy at an average 14.1¢ per kWh; 37% of homes here are detached, so most have a garage or driveway to wire to.

The solar angle worth knowing · as of August 2026

Level 2 home and workplace charging in Ashburn, permitted and code-compliant. If you have solar, an EV is the best load-shifting tool you own: charging from your own midday production converts power that would export at credited one-for-one at retail against your own annual usage into power you avoid buying at the applicable residential retail rate, confirmed against your own bill. Cost is driven by your panel capacity and the cable route, not the charger.

Looking for a solar company in Ashburn? See solar companies in Ashburn: our local team, costs and a free assessment.

Written by , Owner & CEO Reviewed by Drew Taylor, Owner & Sales Director Updated August 2026

Free roof and bill assessment

Takes under a minute. No pressure, and no guaranteed-savings math.

We use your address to look at your roof before we call.

FreeNo obligationLocal Daniel Island team

By sending this you agree to be contacted by call, text or email about your request. Consent isn’t a condition of purchase. Privacy Policy · Terms

Need the detailed version? Use the full assessment form.

30+ yrscombined team experience
~450combined experienced installs
Lifetimefull-system + roof-penetration warranty
StatewideSC-based crews, callbacks within the hour

Local charging reality

Charging reality in Ashburn

Charging economics in Ashburn are the simplest in our territory, because under retail net metering it makes little practical difference whether the car charges from the roof at noon or the grid at midnight. The exported kilowatt-hour and the imported one are valued the same, which removes the load-shifting argument entirely.

What matters instead is capacity, and this is where Ashburn households run into the ceiling. A charger is a substantial continuous load, and adding one is the most common reason a household here wants more array than the current standby threshold comfortably allows. That is the point at which the 15 kW AC question stops being theoretical.

Written for Ashburn specifically.

Solar + EV

Charging from solar in Ashburn

A 9.5 kW system here makes about 11,600 kWh a year; a typical EV uses roughly 3,000 to 4,000. Charging at midday uses power Dominion Energy would otherwise credit at credited one-for-one at retail against your own annual usage.

How we do it

How EV charger installation works in Ashburn

A load calculation, the route from your panel, an electrical permit through Loudoun County and the inspection. We tell you up front whether your panel needs an upgrade.

Cost

What drives EV charger cost in Ashburn

The distance from your panel to where the car parks, spare panel capacity for a 40 to 60 amp circuit, and any trenching. 37% of homes here are detached, so most have a garage or driveway run.

Ashburn specifics

What to expect here

Local constraints that come up on Ashburn charger installs.

  • 01

    Permit and inspection required

    Loudoun County treats hard-wired charging as electrical work.

  • 02

    Service panel capacity

    A dedicated 40 to 60 amp circuit needs room. Load management sometimes avoids a full upgrade at lower cost.

  • 03

    Enclosure rating

    Heat and driving rain still rule out under-specified outdoor enclosures, even without salt exposure.

  • 04

    Visibility and approval

    Loudoun County has adopted a solar equipment tax exemption, and the terms are worth knowing before you apply: the amount and duration are tied to the system’s nameplate capacity in DC watts, the equipment must be certified by the county as used primarily for collecting or generating energy, and the county will not process an application until the system is operating and has passed all required permits. Under SB 504 a Virginia association may impose only reasonable restrictions on rooftop solar, unreasonable being a cost increase above 5% or a generation loss above 10%.

  • 05

    The route to the car

    Panel beside the parking spot is the cheap case. A detached garage needing a trench is the expensive one. This drives price more than the charger does.

  • 06

    Workplace charging

    For businesses, load sharing and who pays for the power matter more than hardware. See commercial.

  • 07

    What you pay to charge here

    Dominion Energy Virginia bills at the applicable residential retail rate, confirmed against your own bill and credits exported solar at credited one-for-one at retail against your own annual usage (August 2026); NOVEC serves some Loudoun County addresses, so confirm the account. With exports credited at retail, when the car charges matters less for the bill than how much it adds to your annual usage.

  • 08

    Charging through an outage

    Four genuine seasons, with summer cooling peaks aligned to peak production and lower winter output. Retail net metering smooths that across the year in a way an export-credit state cannot, which is the main reason a Loudoun system behaves better than its latitude suggests.

Permits and approvals

What approval takes in Ashburn

6 approvals for a Ashburn system. We file every one.

  1. 01A building permit and a separate electrical permit from Loudoun County, or from the town where the address sits inside one
  2. 02An interconnection application to whichever utility serves your meter, Dominion Energy Virginia or NOVEC, on that utility’s own forms
  3. 03Written confirmation of the standby-charge position for any system above 15 kW AC
  4. 04HOA architectural review, which applies across most of the county’s master-planned communities, subject to the SB 504 limits
  5. 05An additional electrical permit where battery storage is included
  6. 06A county application for the solar equipment tax exemption once the system is operating and fully permitted

Standing monthly charge:about $1 a month for customers connecting under NEM 2.0, included in our payback figures.

Your utility decides payback

EV charger installation in Ashburn: your power rate

Dominion Energy Virginia and NOVEC split Ashburn street by street. We read yours off your bill first.

Dominion Energy Virginia

Average home rate (2024)
14.09¢/kWh
Paid for exported solar
credited one-for-one at retail against your own annual usage
Net-metered home solar, utility-wide
53,368

NOVEC

Average home rate (2024)
11.57¢/kWh
Paid for exported solar
Set by the co-op; we confirm it per account
Net-metered home solar, utility-wide
3,602

For comparison: Virginia average 14.41¢ · U.S. average 16.48¢. Virginia had 69,553 net-metered home solar systems at the end of 2024.

Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of August 2026.

Homes in Ashburn

Ashburn homes and EV charger installation

  • 11,694owner-occupied homes (69% of 17,067)
  • 1999median year homes were built
  • 37%of homes are single-family detached
  • $659kmedian owner-occupied home value
  • The median Ashburn home was built in 1999, so many roofs are reaching their second half. We check remaining roof life before we design.
  • Only 37% of homes are single-family detached; in the other 63% the association or shared roof decides first.
  • 11,694 Ashburn households own their home, the ones who can install and claim the system as an asset.
  • A 9.5 kW system at about $27,550 is roughly 4% of the median $659k Ashburn home value.

Source: US Census Bureau, American Community Survey 2023 5-year estimates for Ashburn CDP. Estimates, rounded.

Our work

Real systems our crews have installed

Our own job photos, not stock or renders. Inland Mid-Atlantic.

  • Black solar panels on the roof of a modern farmhouse detached garage; EV charger installation by Sunburst Solar's own crews
    ResidentialDetached garage arrayFarmhouse-style home
  • Solar panels on an asphalt-shingle roof under a clear blue sky; EV charger installation by Sunburst Solar's own crews
    ResidentialShingle rooftop arrayBackyard-facing slope
  • Aerial view of a downtown commercial building with a flat-roof solar install; EV charger installation by Sunburst Solar's own crews
    CommercialDowntown flat roofLow-slope membrane rooftop
  • Neatly aligned black solar panels on a residential shingle roof; EV charger installation by Sunburst Solar's own crews
    ResidentialClean rooftop layoutBlack-framed panels
  • Top-down aerial view of solar panels across a green metal roof in the woods; EV charger installation by Sunburst Solar's own crews
    ResidentialMulti-facet metal roofWooded aerial view
  • Off-grid cabin with a full roof solar array and a lake view behind it; EV charger installation by Sunburst Solar's own crews
    Off-GridCabin porch viewFull-slope roof array

Photo locations are not published.

Free assessment · Ashburn, VA

Get a straight answer for your Ashburn roof

We read your bill, confirm your Dominion Energy Virginia export terms, and tell you what your roof in Loudoun County will actually carry, and say so if it will not pay.

  • Most addresses here are on Dominion Energy Virginia, but NOVEC serves some Loudoun County addresses. We confirm yours from your bill before we quote anything
  • A building permit and a separate electrical permit from Loudoun County, or from the town where the address sits inside one: we pull it and manage the inspections
  • Loudoun County has adopted a solar equipment tax exemption, and the terms are worth knowing before you apply: the amount and duration are tied to the system’s nameplate capacity in DC watts, the equipment must be certified by the county as used primarily for collecting or generating energy, and the county will not process an application until the system is operating and has passed all required permits.

Prefer to talk? (843) 310-1128

We use your address to look at your roof before we call.

FreeNo obligationLocal Daniel Island team

By sending this you agree to be contacted by call, text or email about your request. Consent isn’t a condition of purchase. Privacy Policy · Terms

Need the detailed version? Use the full assessment form.

Ashburn EV charging FAQ

EV charger questions from Ashburn drivers

Should I charge my EV during the day or overnight in Ashburn?

If you have solar, daytime charging is usually better under current rates. Dominion Energy Virginia credits exported power at credited one-for-one at retail against your own annual usage while you buy power at the applicable residential retail rate, confirmed against your own bill, so charging from your own midday production converts low-value export into high-value self-consumption.

Do I need a permit for an EV charger in Loudoun County?

Yes, hard-wired EV charging equipment is electrical work requiring a permit and inspection in Loudoun County, and it must meet the National Electrical Code as adopted in Virginia. We pull the permit and handle the inspection.

How much solar does EV charger installation in Ashburn need to cover my car?

A typical EV uses roughly 3,000 to 4,000 kWh a year. Each kW of panels here makes about 1,221 kWh a year, so about 2 to 3 kW of extra solar covers it. Dominion Energy households paid about 14.1¢ per kWh on average in 2024.

Do I need a permit for EV charger installation in Ashburn?

A hardwired Level 2 charger needs an electrical permit through Loudoun County. We pull it and book the inspection.

Is EV charger installation in Ashburn worth it with solar?

Usually. Charging at midday uses power Dominion Energy would credit at credited one-for-one at retail against your own annual usage instead of exporting it. Dominion Energy households paid about 14.1¢ per kWh on average in 2024.

Free, no-pressure assessment

Get charging sorted at your Ashburn address

We will run the load calculation, look at the route, tell you honestly whether you need a panel upgrade, and set charging up to work with your solar rather than against it.

Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.

Call Free assessment