Commercial solar in Myrtle Beach is sized to daytime load: a business on Santee Cooper at an average 11.4¢ per kWh uses most of its output on site, which is where the value is.
Why the numbers favour business · as of July 2026
Santee Cooper credits exported power at about 4.16¢ per kWh in summer and 3.84¢ outside summer against about 11.4¢ per kWh rate, so the value sits in consuming your own production. A Myrtle Beach business that runs through daylight hours self-consumes most of what it generates, which is exactly what the current Santee Cooper's net metering and rebate programme structure rewards. That is a structural advantage over a typical home.
Looking for a solar company in Myrtle Beach? See solar companies in Myrtle Beach: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local commercial reality
Commercial solar on the Grand Strand is dominated by hospitality: hotels, resorts, restaurants and the retail that serves them. That produces a load profile unlike most commercial modelling assumes, because consumption is driven by occupancy and skews heavily to the summer months and into the evening rather than following a working day.
The seasonal skew is genuinely favourable, since peak occupancy coincides with peak production, and a resort property cooling hundreds of rooms through a July afternoon converts production at full retail value. The evening skew is less so, because restaurant and entertainment load continues well after production stops. Reading interval data rather than assuming a profile is what separates a sound projection from an optimistic one here.
Santee Cooper's retail rate of around 11.4 cents is the lowest we work with, which means each offset kilowatt-hour is worth less than in Duke or Dominion territory and payback is correspondingly longer at the same installed cost. Coastal specification and hurricane wind loading also add real cost. Horry Electric Cooperative serves many surrounding addresses on its own commercial terms, so confirm the meter first.
Written for Myrtle Beach specifically.
How we work
We start from interval data and the Santee Cooper tariff, then check roof structure and service capacity against coastal wind loading before quoting a size.
How we scope a building
Your Santee Cooper interval data and tariff, read before anything is sized.
Low-slope membrane, standing-seam metal or ballasted, plus service capacity and switchgear. Horry County is a high-wind coastal zone with heavy salt exposure, so structural review, roof-access pathways and corrosion-rated hardware all matter. This is not a market for under-specified mounting.
Building and electrical permits with plan review, structural sign-off, and Santee Cooper interconnection.
Sequenced around your operations, then Horry County inspection and monitoring handover.
Commercial systems carry our lifetime full-system and roof-penetration warranty alongside manufacturer coverage, so one contractor stands behind the roof and the array.
Myrtle Beach specifics
The constraints that actually shape a Myrtle Beach commercial design.
Horry County is a high-wind coastal zone with heavy salt exposure, so structural review, roof-access pathways and corrosion-rated hardware all matter. This is not a market for under-specified mounting.
Santee Cooper approval precedes energising, and the queue rather than the install usually sets your date.
A wide mix of HOAs across the resort and residential developments, with real rules on street and beach-side visibility. Condominium and short-term-rental ownership structures add a layer to resolve before design.
Tax
We build and document a Myrtle Beach system for your CPA; South Carolina commercial tax treatment depends on your entity, so it is theirs to call.
Permits and approvals
7 approvals for a Myrtle Beach system. We file every one.
Rebate:Santee Cooper runs a rebate of $950 per kW up to $5,700, which requires a NABCEP-certified crew and Trade Ally participation, is capped at 6 kW-AC over the lifetime of a meter, and is funded annually with a first-come waitlist. It is real money and it materially changes the numbers, but it is rationed, so we confirm current-year availability for your address before it forms part of any figure we give you.
Local factors
Grand Strand lots are often comparatively open, particularly the newer developments, which is favourable. Older interior neighbourhoods carry more pine canopy.
A wide mix of HOAs across the resort and residential developments, with real rules on street and beach-side visibility. Condominium and short-term-rental ownership structures add a layer to resolve before design.
Direct hurricane exposure and mandatory evacuation zones. Extended outages are a genuine planning case here, and for rental properties an outage during a booked week has a direct cost.
Your utility decides payback
Santee Cooper and Horry Electric Cooperative split Myrtle Beach street by street. We read yours off your bill first.
Most addresses
Some addresses
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Myrtle Beach sun, month by month
About 13,710 kWh a year from a south-facing roof with no shade. May is the strongest month at about 1,358 kWh and December the weakest at about 833 kWh.
Your roof will differ. Grand Strand lots are often comparatively open, particularly the newer developments, which is favourable.
Estimate: NASA POWER sun data for Myrtle Beach, PVWatts model, south-facing, no shade.
Our work
Our own job photos, not stock or renders. Horry County is a high-wind coastal zone with heavy salt exposure, so structural review, roof-access pathways and corrosion-rated hardware all matter.






Photo locations are not published.
Free assessment · Myrtle Beach, SC
We read your bill, confirm your Santee Cooper export terms, and tell you what your roof in Horry County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Myrtle Beach commercial solar FAQ
Often yes, for a structural reason. Santee Cooper credits exported power at about 4.16¢ per kWh in summer and 3.84¢ outside summer against about 11.4¢ per kWh, so the value is in consuming your own production. A business that operates through daylight hours self-consumes most of what it generates, which is precisely what the current Santee Cooper's net metering and rebate programme structure rewards.
A building permit and an electrical permit, with standard plan review for systems of roughly 10 kW and above, which covers essentially all commercial work. Horry County is a high-wind coastal zone with heavy salt exposure, so structural review, roof-access pathways and corrosion-rated hardware all matter. This is not a market for under-specified mounting. Santee Cooper interconnection approval is required before energising.
It is sized to the building's daytime load rather than to the roof. Each kW here makes about 1,443 kWh a year unshaded, so a 50 kW array makes roughly 72,200 kWh. Santee Cooper households paid about 11.4¢ per kWh on average in 2024.
Yes. A building permit and a separate electrical permit for a rooftop system; Standard plan review for systems of roughly 10 kW and above. We pull all of it through Horry County.
Santee Cooper households paid about 11.4¢ per kWh on average in 2024. A 100 kW array in Myrtle Beach makes roughly 144,000 kWh a year; the share used on site is worth the retail rate, exports earn about 4.16¢ per kWh in summer and 3.84¢ outside summer.
Nearby
Keep reading
Verify commercial solar turnover with controlled as-builts, inspections, PTO, test records, monitoring, training, warranties, spares, and punch lists.
20 min readCompare commercial PV-only, storage-ready, and solar-plus-storage quotes using load, tariff, resilience, code, utility, and lifecycle evidence.
19 min readTrack South Carolina commercial solar from utility identification and application through studies, design changes, inspection, metering, and written PTO.
19 min readBuild a traceable commercial solar utility-data package with bills, meter maps, interval files, operating changes, exceptions, and a model handoff.
20 min readBuild a commercial solar feasibility study that verifies site, load, utility, design, and approval evidence before your South Carolina project goes to bid.
23 min readCompare commercial solar proposals on one scope: parties, design, production, price, utility work, contract risk, warranties, and acceptance evidence.
21 min readFree, no-pressure assessment
We will read your interval data and tariff, review your roof structure and service capacity, and give you an honest scope, with no guaranteed-savings math.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.