Most addresses
Dominion Energy South Carolina
- Average home rate (2024)
- 14.59¢/kWh
- Paid for exported solar
- about 2.8–4.1¢ per kWh
- Net-metered home solar, utility-wide
- 16,090
EV charging · Lexington, SC
EV charger installation in Lexington usually means a Level 2 circuit on Dominion Energy at an average 14.6¢ per kWh; 63% of homes here are detached, so most have a garage or driveway to wire to.
The solar angle worth knowing · as of July 2026
Level 2 home and workplace charging in Lexington, permitted and code-compliant. If you have solar, an EV is the best load-shifting tool you own: charging from your own midday production converts power that would export at roughly 2.8–4.1¢ per kWh into power you avoid buying at about 14.4¢ per kWh. Cost is driven by your panel capacity and the cable route, not the charger.
Looking for a solar company in Lexington? See solar companies in Lexington: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local charging reality
Lexington has a load profile worth designing around rather than ignoring. Pool pumps are common here, boats and RVs often need shore power, and now a car needs charging, frequently on the same service. The right first step is a whole-property load calculation rather than a charger-shaped one, because the marginal case is not the charger on its own but the charger alongside everything else running on a July afternoon.
Where that calculation is tight, load management usually beats a full service upgrade on cost and is entirely adequate in practice, since the charger and the pool pump rarely need to run flat out at the same moment. Where it is genuinely insufficient, better to know before the conduit is run. Ask for the calculation itself rather than a verbal reassurance, and ask what assumptions it made about your pump.
If you have solar, Lexington is one of the better places to charge from it. Lakeside lots often have unusually good solar access, and Mid-Carolina Electric Cooperative or Dominion Energy South Carolina will credit exported power far below what you pay for it. A car charging in the middle of a sunny afternoon is close to the ideal use of that production, and it is a scheduling decision worth making deliberately.
Written for Lexington specifically.
Solar + EV
A 9.5 kW system here makes about 13,780 kWh a year; a typical EV uses roughly 3,000 to 4,000. Charging at midday uses power Dominion Energy would otherwise credit at about 2.8–4.1¢ per kWh.
How we do it
A load calculation, the route from your panel, an electrical permit through Lexington County and the inspection. We tell you up front whether your panel needs an upgrade.
Cost
The distance from your panel to where the car parks, spare panel capacity for a 40 to 60 amp circuit, and any trenching. 63% of homes here are detached, so most have a garage or driveway run.
Lexington specifics
Local constraints that come up on Lexington charger installs.
Lexington County treats hard-wired charging as electrical work.
A dedicated 40 to 60 amp circuit needs room. Load management sometimes avoids a full upgrade at lower cost.
Heat and driving rain still rule out under-specified outdoor enclosures, even without salt exposure.
Lake Murray communities and the newer suburban subdivisions commonly have HOAs with architectural review, particularly where a roof is visible from the water.
Panel beside the parking spot is the cheap case. A detached garage needing a trench is the expensive one. This drives price more than the charger does.
For businesses, load sharing and who pays for the power matter more than hardware. See commercial.
Dominion Energy South Carolina bills at about 14.4¢ per kWh retail and credits exported solar at roughly 2.8–4.1¢ per kWh (July 2026); Mid-Carolina Electric Cooperative serves many addresses here, so confirm the account. That gap is the whole argument for charging during generating hours rather than overnight.
Midlands summer cooling load is heavy and aligns well with peak production. Pool pumps are common around the lake and are an excellent daytime load to shift onto solar.
Permits and approvals
7 approvals for a Lexington system. We file every one.
Standing monthly charge:about $14 a month, included in our payback figures.
Your utility decides payback
Dominion Energy South Carolina and Mid-Carolina Electric Cooperative split Lexington street by street. We read yours off your bill first.
Most addresses
Some addresses
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Homes in Lexington
Source: US Census Bureau, American Community Survey 2023 5-year estimates for Lexington town. Estimates, rounded.
Our work
Our own job photos, not stock or renders. Inland with no salt exposure, though lakefront properties do see higher wind exposure than sheltered lots.






Photo locations are not published.
Free assessment · Lexington, SC
We read your bill, confirm your Dominion Energy South Carolina export terms, and tell you what your roof in Lexington County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Lexington EV charging FAQ
If you have solar, daytime charging is usually better under current rates. Dominion Energy South Carolina credits exported power at roughly 2.8–4.1¢ per kWh while you buy power at about 14.4¢ per kWh, so charging from your own midday production converts low-value export into high-value self-consumption.
Yes, hard-wired EV charging equipment is electrical work requiring a permit and inspection in Lexington County, and it must meet the National Electrical Code as adopted in South Carolina. We pull the permit and handle the inspection.
A typical EV uses roughly 3,000 to 4,000 kWh a year. Each kW of panels here makes about 1,451 kWh a year, so about 2 to 3 kW of extra solar covers it. Dominion Energy households paid about 14.6¢ per kWh on average in 2024.
A hardwired Level 2 charger needs an electrical permit through Lexington County. We pull it and book the inspection.
Usually. Charging at midday uses power Dominion Energy would credit at about 2.8–4.1¢ per kWh instead of exporting it. Dominion Energy households paid about 14.6¢ per kWh on average in 2024.
Nearby
Keep reading
Calculate solar panels for EV charging from miles, vehicle efficiency, home charging, PVWatts yield, module wattage, roof fit, and utility rules.
24 min readChoose a two-EV home charging design using both vehicles, parking windows, shared or independent EVSE, aggregate controls, capacity, and testing.
25 min readPlan a detached-garage EV charger using feeder or branch options, grounding, trench routes, capacity controls, parking, permits, and commissioning.
24 min readEV load management vs panel upgrade: compare lower charging output, managed charging, panel, service and utility work using a documented load calculation.
24 min readCoordinate home service, meter, panels, feeders, solar, storage, EV charging, controls, and future loads through one documented capacity roadmap.
20 min readPlan a Level 2 EV charger installation by vehicle limits, panel capacity, hardwire or plug connection, permits, quote scope, and acceptance tests.
27 min readFree, no-pressure assessment
We will run the load calculation, look at the route, tell you honestly whether you need a panel upgrade, and set charging up to work with your solar rather than against it.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.