Most addresses
Dominion Energy South Carolina
- Average home rate (2024)
- 14.59¢/kWh
- Paid for exported solar
- about 2.8–4.1¢ per kWh
- Net-metered home solar, utility-wide
- 16,090
Commercial solar · Aiken, SC
Commercial solar in Aiken is sized to daytime load: a business on Dominion Energy at an average 14.6¢ per kWh uses most of its output on site, which is where the value is.
Why the numbers favour business · as of July 2026
Dominion Energy South Carolina credits exported power at roughly 2.8–4.1¢ per kWh against about 14.4¢ per kWh rate, so the value sits in consuming your own production. A Aiken business that runs through daylight hours self-consumes most of what it generates, which is exactly what the current Solar Choice structure rewards. That is a structural advantage over a typical home.
Looking for a solar company in Aiken? See solar companies in Aiken: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local commercial reality
Aiken’s commercial stock splits into two projects that have little in common. Downtown frontages sit under the same design review as the historic residential districts, so roof-mounted equipment visible from the street becomes a review question before it becomes an engineering one. Out along the county corridors the buildings are modern low-slope commercial and light industrial, where the roof is straightforward and the constraint is the electrical service instead.
The county’s equestrian and agricultural properties are a third category worth naming, because they are genuinely well suited and rarely quoted properly. Barns, covered arenas and outbuildings offer large simple roof planes without the historic review that governs the house, and many of these parcels have open ground for a ground-mounted array. Ground mounts add a zoning review, which is a known step rather than an obstacle.
On any Aiken commercial building the utility question returns with more force than it carries residentially, because the volumes are larger. A commercial site on Aiken Electric Cooperative and one on Dominion Energy South Carolina should be modelled against different export terms and, often, different interconnection paths. We read interval data rather than assuming a nine-to-five load profile, since a building that peaks after dark converts its own production very differently from one that peaks at noon.
Written for Aiken specifically.
How we work
We start from interval data and the Dominion Energy tariff, then check roof structure and service capacity before quoting a size.
How we scope a building
Your Dominion Energy South Carolina interval data and tariff, read before anything is sized.
Low-slope membrane, standing-seam metal or ballasted, plus service capacity and switchgear. Inland, so salt exposure is not a factor and wind loading is well below the coast. South Carolina structural requirements still apply, and which authority reviews them depends on whether you sit in the city of Aiken, in North Augusta, or in unincorporated Aiken County.
Building and electrical permits with plan review, structural sign-off, and Dominion Energy South Carolina interconnection.
Sequenced around your operations, then Aiken County inspection and monitoring handover.
Commercial systems carry our lifetime full-system and roof-penetration warranty alongside manufacturer coverage, so one contractor stands behind the roof and the array.
Aiken specifics
The constraints that actually shape a Aiken commercial design.
Inland, so salt exposure is not a factor and wind loading is well below the coast. South Carolina structural requirements still apply, and which authority reviews them depends on whether you sit in the city of Aiken, in North Augusta, or in unincorporated Aiken County.
Dominion Energy South Carolina approval precedes energising, and the queue rather than the install usually sets your date.
Inside the city, the Design Review Board reviews work in the Historic Overlay and Old Aiken Overlay districts and issues the Certificate of Appropriateness. It is a quasi-judicial body and its decision on a Certificate is final, with appeal only to a court, so a design that assumes no review can come back materially smaller after one meeting. Properties carry a landmark, contributing or noncontributing designation, and which one applies changes what may be altered.
Tax
We build and document a Aiken system for your CPA; South Carolina commercial tax treatment depends on your entity, so it is theirs to call.
Permits and approvals
6 approvals for a Aiken system. We file every one.
Standing monthly charge:about $14 a month, included in our payback figures.
Local factors
The Winter Colony streets and the blocks around Hitchcock Woods carry heavy mature canopy, which is a real production constraint rather than a cosmetic one. The newer development further out from the historic core is substantially more open.
Inside the city, the Design Review Board reviews work in the Historic Overlay and Old Aiken Overlay districts and issues the Certificate of Appropriateness. It is a quasi-judicial body and its decision on a Certificate is final, with appeal only to a court, so a design that assumes no review can come back materially smaller after one meeting. Properties carry a landmark, contributing or noncontributing designation, and which one applies changes what may be altered.
Midlands-edge summers run hot and long, so cooling load peaks in the same hours a roof produces hardest. Summer thunderstorm outages do occur, and rural cooperative circuits further out of town can take longer to restore than in-town Dominion circuits.
Your utility decides payback
Dominion Energy South Carolina and Aiken Electric Cooperative split Aiken street by street. We read yours off your bill first.
Most addresses
Some addresses
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Aiken sun, month by month
About 13,780 kWh a year from a south-facing roof with no shade. May is the strongest month at about 1,315 kWh and December the weakest at about 866 kWh.
Your roof will differ. The Winter Colony streets and the blocks around Hitchcock Woods carry heavy mature canopy, which is a real production constraint rather than a cosmetic one.
Estimate: NASA POWER sun data for Aiken, PVWatts model, south-facing, no shade.
Our work
Our own job photos, not stock or renders. Inland, so salt exposure is not a factor and wind loading is well below the coast.






Photo locations are not published.
Free assessment · Aiken, SC
We read your bill, confirm your Dominion Energy South Carolina export terms, and tell you what your roof in Aiken County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Aiken commercial solar FAQ
Often yes, for a structural reason. Dominion Energy South Carolina credits exported power at roughly 2.8–4.1¢ per kWh against about 14.4¢ per kWh, so the value is in consuming your own production. A business that operates through daylight hours self-consumes most of what it generates, which is precisely what the current Solar Choice structure rewards.
A building permit and an electrical permit, with standard plan review for systems of roughly 10 kW and above, which covers essentially all commercial work. Inland, so salt exposure is not a factor and wind loading is well below the coast. South Carolina structural requirements still apply, and which authority reviews them depends on whether you sit in the city of Aiken, in North Augusta, or in unincorporated Aiken County. Dominion Energy South Carolina interconnection approval is required before energising.
It is sized to the building's daytime load rather than to the roof. Each kW here makes about 1,451 kWh a year unshaded, so a 50 kW array makes roughly 72,500 kWh. Dominion Energy households paid about 14.6¢ per kWh on average in 2024.
Yes. A building permit and a separate electrical permit for a rooftop system; Permits from the City of Aiken if you are inside city limits, from the City of North Augusta if you are inside its limits, or from Aiken County Planning & Development if you are in the unincorporated county, which are three different processes. We pull all of it through Aiken County.
Dominion Energy households paid about 14.6¢ per kWh on average in 2024. A 100 kW array in Aiken makes roughly 145,000 kWh a year; the share used on site is worth the retail rate, exports earn about 2.8–4.1¢ per kWh.
Keep reading
Compare commercial PV-only, storage-ready, and solar-plus-storage quotes using load, tariff, resilience, code, utility, and lifecycle evidence.
19 min readTrack South Carolina commercial solar from utility identification and application through studies, design changes, inspection, metering, and written PTO.
19 min readBuild a traceable commercial solar utility-data package with bills, meter maps, interval files, operating changes, exceptions, and a model handoff.
20 min readBuild a commercial solar feasibility study that verifies site, load, utility, design, and approval evidence before your South Carolina project goes to bid.
23 min readCompare commercial solar proposals on one scope: parties, design, production, price, utility work, contract risk, warranties, and acceptance evidence.
21 min readAudit commercial solar ROI in South Carolina using interval loads, tariffs, production, lifecycle costs, tax timing, NPV, IRR, and sensitivity.
30 min readFree, no-pressure assessment
We will read your interval data and tariff, review your roof structure and service capacity, and give you an honest scope, with no guaranteed-savings math.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.