Most addresses
Dominion Energy South Carolina
- Average home rate (2024)
- 14.59¢/kWh
- Paid for exported solar
- about 2.8–4.1¢ per kWh
- Net-metered home solar, utility-wide
- 16,090
EV charging · Mount Pleasant, SC
EV charger installation in Mount Pleasant usually means a Level 2 circuit on Dominion Energy at an average 14.6¢ per kWh; 65% of homes here are detached, so most have a garage or driveway to wire to.
The solar angle worth knowing · as of July 2026
Level 2 home and workplace charging in Mount Pleasant, permitted and code-compliant. If you have solar, an EV is the best load-shifting tool you own: charging from your own midday production converts power that would export at roughly 2.8–4.1¢ per kWh into power you avoid buying at about 14.4¢ per kWh. Cost is driven by your panel capacity and the cable route, not the charger.
Looking for a solar company in Mount Pleasant? See solar companies in Mount Pleasant: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local charging reality
Mount Pleasant has high EV density and mostly attached garages on relatively modern electrical services, which makes it one of the more straightforward markets in the state for a clean Level 2 installation. The runs are short, the panels usually have capacity, and the work is often a single day. That is genuinely good news, and it means the questions worth asking here are not really electrical ones.
The complication is aesthetic. Where the unit, its conduit or a new subpanel is visible from the street, the architectural-review committee may well have a view, and this is one of the most HOA-dense markets in the Lowcountry. It is worth establishing that before hardware is ordered, because a wall-mounted unit in a visible position is exactly the kind of small change that generates a letter from the committee three weeks after the work is done.
If solar is already on the roof or planned, size the two together rather than sequentially. Under Dominion's current terms, exported power earns a few cents while evening power costs full retail, so a household that can shift charging into generating hours changes its own economics substantially. That is a scheduling decision as much as a hardware one, and it is worth having before the charger is specified rather than after.
Written for Mount Pleasant specifically.
Solar + EV
A 9.5 kW system here makes about 13,940 kWh a year; a typical EV uses roughly 3,000 to 4,000. Charging at midday uses power Dominion Energy would otherwise credit at about 2.8–4.1¢ per kWh.
How we do it
A load calculation, the route from your panel, an electrical permit through Charleston County and the inspection. We tell you up front whether your panel needs an upgrade.
Cost
The distance from your panel to where the car parks, spare panel capacity for a 40 to 60 amp circuit, and any trenching. 65% of homes here are detached, so most have a garage or driveway run.
Mount Pleasant specifics
Local constraints that come up on Mount Pleasant charger installs.
Charleston County treats hard-wired charging as electrical work.
A dedicated 40 to 60 amp circuit needs room. Older coastal-city services are often already full.
Salt air is unkind to under-specified outdoor enclosures and connectors. Coastal-rated hardware is not optional here.
Mount Pleasant is one of the most HOA-dense markets in the Lowcountry, with active architectural-review committees that have real rules on panel placement and street visibility.
Panel beside the parking spot is the cheap case. A detached garage needing a trench is the expensive one. This drives price more than the charger does.
For businesses, load sharing and who pays for the power matter more than hardware. See commercial.
Dominion Energy South Carolina bills at about 14.4¢ per kWh retail and credits exported solar at roughly 2.8–4.1¢ per kWh (July 2026); Berkeley Electric Cooperative serves some addresses, so confirm the account. That gap is the whole argument for charging during generating hours rather than overnight.
Multi-day hurricane-season outages are the design case here, which favours backing up essentials well over trying to run the whole house.
Permits and approvals
7 approvals for a Mount Pleasant system. We file every one.
Standing monthly charge:about $14 a month, included in our payback figures.
Your utility decides payback
Dominion Energy South Carolina and Berkeley Electric Cooperative split Mount Pleasant street by street. We read yours off your bill first.
Most addresses
Some addresses
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Homes in Mount Pleasant
Source: US Census Bureau, American Community Survey 2023 5-year estimates for Mount Pleasant town. Estimates, rounded.
Our work
Our own job photos, not stock or renders. Charleston County is a high-wind coastal zone, so structural review and roof-penetration detailing matter, and salt exposure rules out under-specified hardware.






Photo locations are not published.
Free assessment · Mount Pleasant, SC
We read your bill, confirm your Dominion Energy South Carolina export terms, and tell you what your roof in Charleston County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Mount Pleasant EV charging FAQ
If you have solar, daytime charging is usually better under current rates. Dominion Energy South Carolina credits exported power at roughly 2.8–4.1¢ per kWh while you buy power at about 14.4¢ per kWh, so charging from your own midday production converts low-value export into high-value self-consumption.
Yes, hard-wired EV charging equipment is electrical work requiring a permit and inspection in Charleston County, and it must meet the National Electrical Code as adopted in South Carolina. We pull the permit and handle the inspection.
A typical EV uses roughly 3,000 to 4,000 kWh a year. Each kW of panels here makes about 1,467 kWh a year, so about 2 to 3 kW of extra solar covers it. Dominion Energy households paid about 14.6¢ per kWh on average in 2024.
A hardwired Level 2 charger needs an electrical permit through Charleston County. We pull it and book the inspection.
Usually. Charging at midday uses power Dominion Energy would credit at about 2.8–4.1¢ per kWh instead of exporting it. Dominion Energy households paid about 14.6¢ per kWh on average in 2024.
Nearby
Keep reading
Calculate solar panels for EV charging from miles, vehicle efficiency, home charging, PVWatts yield, module wattage, roof fit, and utility rules.
24 min readChoose a two-EV home charging design using both vehicles, parking windows, shared or independent EVSE, aggregate controls, capacity, and testing.
25 min readPlan a detached-garage EV charger using feeder or branch options, grounding, trench routes, capacity controls, parking, permits, and commissioning.
24 min readEV load management vs panel upgrade: compare lower charging output, managed charging, panel, service and utility work using a documented load calculation.
24 min readCoordinate home service, meter, panels, feeders, solar, storage, EV charging, controls, and future loads through one documented capacity roadmap.
20 min readPlan a Level 2 EV charger installation by vehicle limits, panel capacity, hardwire or plug connection, permits, quote scope, and acceptance tests.
27 min readFree, no-pressure assessment
We will run the load calculation, look at the route, tell you honestly whether you need a panel upgrade, and set charging up to work with your solar rather than against it.