EV charging · Florence, SC

EV charger installation in Florence, SC

EV charger installation in Florence usually means a Level 2 circuit on Duke Energy Progress at an average 14.9¢ per kWh; 67% of homes here are detached, so most have a garage or driveway to wire to.

The solar angle worth knowing · as of July 2026

Level 2 home and workplace charging in Florence, permitted and code-compliant. If you have solar, an EV is the best load-shifting tool you own: charging from your own midday production converts power that would export at roughly 2.6–4¢ per kWh into power you avoid buying at your full retail rate. Cost is driven by your panel capacity and the cable route, not the charger.

Looking for a solar company in Florence? See solar companies in Florence: our local team, costs and a free assessment.

Written by , Owner & CEO Reviewed by Drew Taylor, Owner & Sales Director Updated July 2026

Free roof and bill assessment

Takes under a minute. No pressure, and no guaranteed-savings math.

We use your address to look at your roof before we call.

FreeNo obligationLocal Daniel Island team

By sending this you agree to be contacted by call, text or email about your request. Consent isn’t a condition of purchase. Privacy Policy · Terms

Need the detailed version? Use the full assessment form.

30+ yrscombined team experience
~450combined experienced installs
Lifetimefull-system + roof-penetration warranty
StatewideSC-based crews, callbacks within the hour

Local charging reality

Charging reality in Florence

The case for home charging in Florence is strongest when it is paired with daytime generation, and the reason is arithmetic rather than preference. Duke Energy Progress credits exported power at roughly 2.6 to 4 cents per kilowatt-hour against your full retail rate. A car charging while your array is producing consumes that power at full value; a car charging at midnight buys it back at retail after you sold it for pennies.

The physical side is comparatively easy here. Pee Dee lots are generously sized, garages are frequently attached or close to the house, and there are far fewer architectural-review constraints than in the Lowcountry markets. That means the cable run is usually short and the approval step often does not exist at all, so the load calculation on your existing panel is the main variable in the price.

Florence County treats hard-wired charging as electrical work requiring a permit and inspection. Anyone offering to skip that step is creating a problem for your insurance and for your eventual sale, and it is a straightforward part of the job when handled properly. Where Pee Dee Electric Cooperative rather than Duke serves the meter, we confirm their position first if solar is also in scope.

Written for Florence specifically.

Solar + EV

Charging from solar in Florence

A 9.5 kW system here makes about 13,510 kWh a year; a typical EV uses roughly 3,000 to 4,000. Charging at midday uses power Duke Energy Progress would otherwise credit at about 2.6–4¢ per kWh.

How we do it

How EV charger installation works in Florence

A load calculation, the route from your panel, an electrical permit through Florence County and the inspection. We tell you up front whether your panel needs an upgrade.

Cost

What drives EV charger cost in Florence

The distance from your panel to where the car parks, spare panel capacity for a 40 to 60 amp circuit, and any trenching. 67% of homes here are detached, so most have a garage or driveway run.

Florence specifics

What to expect here

Local constraints that come up on Florence charger installs.

  • 01

    Permit and inspection required

    Florence County treats hard-wired charging as electrical work.

  • 02

    Service panel capacity

    A dedicated 40 to 60 amp circuit needs room. Load management sometimes avoids a full upgrade at lower cost.

  • 03

    Enclosure rating

    Heat and driving rain still rule out under-specified outdoor enclosures, even without salt exposure.

  • 04

    Visibility and approval

    Fewer architectural-review constraints than the Lowcountry markets. Newer subdivisions have HOAs, but historic-district style controls on panel visibility are rare here.

  • 05

    The route to the car

    Panel beside the parking spot is the cheap case. A detached garage needing a trench is the expensive one. This drives price more than the charger does.

  • 06

    Workplace charging

    For businesses, load sharing and who pays for the power matter more than hardware. See commercial.

  • 07

    What you pay to charge here

    Duke Energy Progress bills at your full retail rate and credits exported solar at roughly 2.6–4¢ per kWh (July 2026); Pee Dee Electric Cooperative and other cooperatives serve surrounding addresses, so confirm the account. That gap is the whole argument for charging during generating hours rather than overnight.

  • 08

    Charging through an outage

    Hot Pee Dee summers drive heavy cooling load through the afternoon, and storms coming inland off the coast still cause outages on this part of the grid.

Permits and approvals

What approval takes in Florence

6 approvals for a Florence system. We file every one.

  1. 01A building permit and a separate electrical permit for a rooftop system
  2. 02Standard plan review for systems of roughly 10 kW and above
  3. 03A zoning review as well for any ground-mounted array
  4. 04An additional electrical permit where battery storage is included
  5. 05Structural review under Florence County requirements
  6. 06Duke interconnection approval before the system is allowed to energise

Rebate:Duke's PowerPair solar-and-battery incentive closed to new applications in Progress territory in late 2025, so it should not be counted on here. Duke's battery bill-credit programme has remained open and pays a monthly credit rather than cash up front. We confirm current status for your address rather than promising a programme that may be full.

Your utility decides payback

EV charger installation in Florence: your power rate

Your utility sets what exported power is worth, which shapes the right system size more than any panel choice.

Duke Energy Progress

Average home rate (2024)
14.88¢/kWh
Paid for exported solar
about 2.6–4¢ per kWh
Net-metered home solar, utility-wide
2,341

For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.

Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.

Homes in Florence

Florence homes and EV charger installation

  • 9,822owner-occupied homes (60% of 16,450)
  • 1982median year homes were built
  • 67%of homes are single-family detached
  • $190kmedian owner-occupied home value
  • Half of Florence homes are more than 44 years old, so the roof check matters here: a roof with under ten years left should be replaced before solar goes on, or at the same time.
  • Only 67% of homes are single-family detached; in the other 33% the association or shared roof decides first.
  • 9,822 Florence households own their home, the ones who can install and claim the state credit.
  • A 9.5 kW system at about $24,605 is roughly 13% of the median $190k Florence home value.

Source: US Census Bureau, American Community Survey 2023 5-year estimates for Florence city. Estimates, rounded.

Our work

Real systems our crews have installed

Our own job photos, not stock or renders. Inland, so salt exposure is not a factor and wind loading is lower than on the coast.

  • Neatly aligned black solar panels on a residential shingle roof; EV charger installation by Sunburst Solar's own crews
    ResidentialClean rooftop layoutBlack-framed panels
  • Top-down aerial view of solar panels across a green metal roof in the woods; EV charger installation by Sunburst Solar's own crews
    ResidentialMulti-facet metal roofWooded aerial view
  • Off-grid cabin with a full roof solar array and a lake view behind it; EV charger installation by Sunburst Solar's own crews
    Off-GridCabin porch viewFull-slope roof array
  • Aerial view of an off-grid cabin above a South Carolina lake with a roof solar array; EV charger installation by Sunburst Solar's own crews
    Off-GridOff-grid lake cabinGround-tilt metal roof array
  • Single-story home with a full black-on-black rooftop solar array beside a pool; EV charger installation by Sunburst Solar's own crews
    ResidentialFull black-on-blackPoolside single-story home
  • Rows of tilt-mounted solar panels on a commercial building rooftop; EV charger installation by Sunburst Solar's own crews
    CommercialCommercial rooftopTilt-mounted rooftop system

Photo locations are not published.

Free assessment · Florence, SC

Get a straight answer for your Florence roof

We read your bill, confirm your Duke Energy Progress export terms, and tell you what your roof in Florence County will actually carry, and say so if it will not pay.

  • Most addresses here are on Duke Energy Progress, but Pee Dee Electric Cooperative and other cooperatives serve surrounding addresses. We confirm yours from your bill before we quote anything
  • A building permit and a separate electrical permit for a rooftop system: we pull it and manage the inspections
  • Fewer architectural-review constraints than the Lowcountry markets.

Prefer to talk? (843) 310-1128

We use your address to look at your roof before we call.

FreeNo obligationLocal Daniel Island team

By sending this you agree to be contacted by call, text or email about your request. Consent isn’t a condition of purchase. Privacy Policy · Terms

Need the detailed version? Use the full assessment form.

Florence EV charging FAQ

EV charger questions from Florence drivers

Should I charge my EV during the day or overnight in Florence?

If you have solar, daytime charging is usually better under current rates. Duke Energy Progress credits exported power at roughly 2.6–4¢ per kWh while you buy power at your full retail rate, so charging from your own midday production converts low-value export into high-value self-consumption.

Do I need a permit for an EV charger in Florence County?

Yes, hard-wired EV charging equipment is electrical work requiring a permit and inspection in Florence County, and it must meet the National Electrical Code as adopted in South Carolina. We pull the permit and handle the inspection.

How much solar does EV charger installation in Florence need to cover my car?

A typical EV uses roughly 3,000 to 4,000 kWh a year. Each kW of panels here makes about 1,422 kWh a year, so about 2 to 3 kW of extra solar covers it. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.

Do I need a permit for EV charger installation in Florence?

A hardwired Level 2 charger needs an electrical permit through Florence County. We pull it and book the inspection.

Is EV charger installation in Florence worth it with solar?

Usually. Charging at midday uses power Duke Energy Progress would credit at about 2.6–4¢ per kWh instead of exporting it. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.

Free, no-pressure assessment

Get charging sorted at your Florence address

We will run the load calculation, look at the route, tell you honestly whether you need a panel upgrade, and set charging up to work with your solar rather than against it.

Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.

Call Free assessment