Serves Florence
Duke Energy Progress
- Average home rate (2024)
- 14.88¢/kWh
- Paid for exported solar
- about 2.6–4¢ per kWh
- Net-metered home solar, utility-wide
- 2,341
EV charging · Florence, SC
EV charger installation in Florence usually means a Level 2 circuit on Duke Energy Progress at an average 14.9¢ per kWh; 67% of homes here are detached, so most have a garage or driveway to wire to.
The solar angle worth knowing · as of July 2026
Level 2 home and workplace charging in Florence, permitted and code-compliant. If you have solar, an EV is the best load-shifting tool you own: charging from your own midday production converts power that would export at roughly 2.6–4¢ per kWh into power you avoid buying at your full retail rate. Cost is driven by your panel capacity and the cable route, not the charger.
Looking for a solar company in Florence? See solar companies in Florence: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local charging reality
The case for home charging in Florence is strongest when it is paired with daytime generation, and the reason is arithmetic rather than preference. Duke Energy Progress credits exported power at roughly 2.6 to 4 cents per kilowatt-hour against your full retail rate. A car charging while your array is producing consumes that power at full value; a car charging at midnight buys it back at retail after you sold it for pennies.
The physical side is comparatively easy here. Pee Dee lots are generously sized, garages are frequently attached or close to the house, and there are far fewer architectural-review constraints than in the Lowcountry markets. That means the cable run is usually short and the approval step often does not exist at all, so the load calculation on your existing panel is the main variable in the price.
Florence County treats hard-wired charging as electrical work requiring a permit and inspection. Anyone offering to skip that step is creating a problem for your insurance and for your eventual sale, and it is a straightforward part of the job when handled properly. Where Pee Dee Electric Cooperative rather than Duke serves the meter, we confirm their position first if solar is also in scope.
Written for Florence specifically.
Solar + EV
A 9.5 kW system here makes about 13,510 kWh a year; a typical EV uses roughly 3,000 to 4,000. Charging at midday uses power Duke Energy Progress would otherwise credit at about 2.6–4¢ per kWh.
How we do it
A load calculation, the route from your panel, an electrical permit through Florence County and the inspection. We tell you up front whether your panel needs an upgrade.
Cost
The distance from your panel to where the car parks, spare panel capacity for a 40 to 60 amp circuit, and any trenching. 67% of homes here are detached, so most have a garage or driveway run.
Florence specifics
Local constraints that come up on Florence charger installs.
Florence County treats hard-wired charging as electrical work.
A dedicated 40 to 60 amp circuit needs room. Load management sometimes avoids a full upgrade at lower cost.
Heat and driving rain still rule out under-specified outdoor enclosures, even without salt exposure.
Fewer architectural-review constraints than the Lowcountry markets. Newer subdivisions have HOAs, but historic-district style controls on panel visibility are rare here.
Panel beside the parking spot is the cheap case. A detached garage needing a trench is the expensive one. This drives price more than the charger does.
For businesses, load sharing and who pays for the power matter more than hardware. See commercial.
Duke Energy Progress bills at your full retail rate and credits exported solar at roughly 2.6–4¢ per kWh (July 2026); Pee Dee Electric Cooperative and other cooperatives serve surrounding addresses, so confirm the account. That gap is the whole argument for charging during generating hours rather than overnight.
Hot Pee Dee summers drive heavy cooling load through the afternoon, and storms coming inland off the coast still cause outages on this part of the grid.
Permits and approvals
6 approvals for a Florence system. We file every one.
Rebate:Duke's PowerPair solar-and-battery incentive closed to new applications in Progress territory in late 2025, so it should not be counted on here. Duke's battery bill-credit programme has remained open and pays a monthly credit rather than cash up front. We confirm current status for your address rather than promising a programme that may be full.
Your utility decides payback
Your utility sets what exported power is worth, which shapes the right system size more than any panel choice.
Serves Florence
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Homes in Florence
Source: US Census Bureau, American Community Survey 2023 5-year estimates for Florence city. Estimates, rounded.
Our work
Our own job photos, not stock or renders. Inland, so salt exposure is not a factor and wind loading is lower than on the coast.






Photo locations are not published.
Free assessment · Florence, SC
We read your bill, confirm your Duke Energy Progress export terms, and tell you what your roof in Florence County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Florence EV charging FAQ
If you have solar, daytime charging is usually better under current rates. Duke Energy Progress credits exported power at roughly 2.6–4¢ per kWh while you buy power at your full retail rate, so charging from your own midday production converts low-value export into high-value self-consumption.
Yes, hard-wired EV charging equipment is electrical work requiring a permit and inspection in Florence County, and it must meet the National Electrical Code as adopted in South Carolina. We pull the permit and handle the inspection.
A typical EV uses roughly 3,000 to 4,000 kWh a year. Each kW of panels here makes about 1,422 kWh a year, so about 2 to 3 kW of extra solar covers it. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.
A hardwired Level 2 charger needs an electrical permit through Florence County. We pull it and book the inspection.
Usually. Charging at midday uses power Duke Energy Progress would credit at about 2.6–4¢ per kWh instead of exporting it. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.
Nearby
Keep reading
Coordinate home service, meter, panels, feeders, solar, storage, EV charging, controls, and future loads through one documented capacity roadmap.
20 min readPlan a Level 2 EV charger installation by vehicle limits, panel capacity, hardwire or plug connection, permits, quote scope, and acceptance tests.
27 min readCalculate solar panels for EV charging from miles, vehicle efficiency, home charging, PVWatts yield, module wattage, roof fit, and utility rules.
24 min readChoose a two-EV home charging design using both vehicles, parking windows, shared or independent EVSE, aggregate controls, capacity, and testing.
25 min readPlan a detached-garage EV charger using feeder or branch options, grounding, trench routes, capacity controls, parking, permits, and commissioning.
24 min readEV load management vs panel upgrade: compare lower charging output, managed charging, panel, service and utility work using a documented load calculation.
24 min readFree, no-pressure assessment
We will run the load calculation, look at the route, tell you honestly whether you need a panel upgrade, and set charging up to work with your solar rather than against it.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.