Serves Florence
Duke Energy Progress
- Average home rate (2024)
- 14.88¢/kWh
- Paid for exported solar
- about 2.6–4¢ per kWh
- Net-metered home solar, utility-wide
- 2,341
Honest numbers · Florence, SC
Solar panel cost in Florence runs about $2.59 per watt installed in 2026: a 9.5 kW system is about $24,605, or $18,454 after the 25% SC credit, and makes about 13,510 kWh a year here.
The short answer · as of July 2026
Solar in the Florence area costs about $2.59 per watt installed before incentives as of July 2026. A system near our ~9.5 kW average runs roughly $24,605 gross and about $18,454 once South Carolina’s 25% state tax credit is fully claimed. Payback depends on your Duke Energy Progress rate and on how much production you use on site, so we model it from your own bill rather than publishing a market average.
Looking for a solar company in Florence? See solar companies in Florence: our local team, costs and a free assessment.
Free roof and bill assessment
Takes under a minute. No pressure, and no guaranteed-savings math.
Local pricing reality
Florence is one of the more straightforward markets we price. Pee Dee lots are generously sized with pines around the house rather than over it, so full-day shading is less common than in the older coastal markets, and there are far fewer architectural-review controls on panel visibility. Fewer constraints means less design and submission work, which shows up as a cleaner quote.
What decides the total here is sizing rather than complexity, and sizing is decided by Duke Energy Progress crediting exported power at roughly 2.6 to 4 cents against your full retail rate. That makes the right system one matched to your daytime consumption rather than to your available roof. A larger array is not better value here; it is capacity sold into a market that pays a few cents for it.
Because Duke's residential retail rate depends on your rate schedule rather than a single published figure, insist that any payback arithmetic uses your own bill rather than a state average. Ask what share of production the model assumes you consume on site, and what the payback looks like if that share is ten points lower. That sensitivity matters more than the per-watt price.
Written for Florence specifically.
The numbers
Priced at the local $2.59 per watt benchmark (July 2026) and shown before and after South Carolina’s 25% state tax credit. These are worked examples to set expectations, not a quote, and not a promise of savings.
| System size | Cost before incentives | SC 25% credit (TC-38) | Net after credit |
|---|---|---|---|
| 6 kW | $15,540 | $3,885 over 2 tax years | $11,655 |
| 9.5 kW Closest to our ~9.5 kW average system | $24,605 | $6,151 over 2 tax years | $18,454 |
| 12 kW | $31,080 | $7,770 over 3 tax years | $23,310 |
| 15 kW | $38,850 | $9,713 over 3 tax years | $29,138 |
Note the third column carefully. The credit is 25% of system cost but capped at $3,500 per tax year, so a larger system is claimed across several returns rather than all at once. Most pages quoting "25% off" skip this, and it is the most common reason homeowners feel misled later. See exactly how the credit is claimed.
Sizing
Calculators assume a national-average system of 14.48 kW; our average is about 9.5 kW, which makes about 13,510 kWh a year here. Sizing past your own use earns only Duke Energy Progress's export rate.
The part competitors leave out
Most Florence homes are served by Duke Energy Progress , though Pee Dee Electric Cooperative and other cooperatives serve surrounding addresses. One-for-one net metering closed to new applicants on 1 June 2021, and new Duke Energy Progress systems are credited under Duke's current residential solar rate structure instead, at roughly 2.6–4¢ per kWh for exports. So Florence payback depends on how much you use at home.
We have not published a retail-rate table for this page because we will not print a Duke rate we have not verified against your own tariff. Duke credits exported power at roughly 2.6–4¢ per kWh, well below retail, so the self-consumption logic below still holds. At the assessment we read your actual bill and model payback against your real rate rather than a market average.
The mechanic is simple. Power you consume the moment you generate it offsets electricity you would have bought at your full retail rate. Power you export earns only roughly 2.6–4¢ per kWh, and Daytime use is what pays here.
2026 incentives
The net column above already applies South Carolina’s 25% state tax credit. Two things worth knowing about it: the $3,500 annual cap means larger systems are claimed across more than one tax return, and the credit is non-refundable, so it is limited by your state tax liability.
The 30% federal credit expired for systems placed in service on or after 1 January 2026. If a quote you are comparing still applies it, that quote is wrong by thousands.
Duke's PowerPair solar-and-battery incentive closed to new applications in Progress territory in late 2025, so it should not be counted on here. Duke's battery bill-credit programme has remained open and pays a monthly credit rather than cash up front. We confirm current status for your address rather than promising a programme that may be full.
Incentives specific to Florence · statewide mechanics and worked examples · financing
Line items
In Florence the swings come from roof age (the median Florence home was built in 1982), structural review and roof access, the 6 approvals Florence County requires, and whether Duke Energy Progress's export terms favour a smaller system.
Paying for it
On a 9.5 kW system at $24,605, ask for the cash and financed price side by side; a low loan rate often hides a dealer fee in the price.
The South Carolina-specific trap: because the state credit is capped at $3,500 a year, it arrives across several tax years. A loan structured around one large first-year credit payment will not behave as presented.
The honest part
If two or more of these describe your home, we will say so during the assessment and we will not design a system to talk you past them. That is the whole point of a free, no-pressure assessment. If circumstances change, we will still be here.
Our work
Our pricing comes from ~450 combined experienced installs and a ~9.5 kW average system, priced for Florence County permitting.
Permits and approvals
6 approvals for a Florence system. We file every one.
Your utility decides payback
Your utility sets what exported power is worth, which shapes the right system size more than any panel choice.
Serves Florence
For comparison: South Carolina average 14.23¢ · U.S. average 16.48¢. South Carolina had 40,055 net-metered home solar systems at the end of 2024.
Rates: US EIA Form EIA-861, 2024 averages incl. fixed charges, not tariffs. Export terms as of July 2026.
Florence sun, month by month
About 13,510 kWh a year from a south-facing roof with no shade. May is the strongest month at about 1,288 kWh and December the weakest at about 835 kWh.
Your roof will differ. Pee Dee lots are often generously sized with pines around the house rather than over it, so full-day shading is less common here than in the older coastal cities.
Estimate: NASA POWER sun data for Florence, PVWatts model, south-facing, no shade.
Homes in Florence
Source: US Census Bureau, American Community Survey 2023 5-year estimates for Florence city. Estimates, rounded.
Our work
Our own job photos, not stock or renders. Inland, so salt exposure is not a factor and wind loading is lower than on the coast.






Photo locations are not published.
Free assessment · Florence, SC
We read your bill, confirm your Duke Energy Progress export terms, and tell you what your roof in Florence County will actually carry, and say so if it will not pay.
Prefer to talk? (843) 310-1128
Florence solar cost FAQ
As of July 2026, solar in the Florence area runs about $2.59 per watt installed before incentives. A system close to our ~9.5 kW average works out to roughly $24,605 gross, or about $18,454 once South Carolina’s 25% state tax credit is fully claimed. Your own number depends on your roof, your usage and your utility.
No. The federal residential clean energy credit (Section 25D) expired for systems placed in service on or after January 1, 2026. Many pages online still advertise it. South Carolina’s 25% state tax credit did not expire and is now the main incentive for homeowners here. The strongest remaining lever here is the 25% state credit on Form TC-38.
We will not publish a payback figure for Florence that we cannot stand behind, because Duke Energy Progress's residential rate needs confirming against your own bill. What is certain is that exported power credits at roughly 2.6–4¢ per kWh, well below retail, so the share of production you use on site drives your payback more than any equipment choice. At the assessment we model it against your actual rate.
Because we size to your bill rather than to a sales quota. National cost calculators model 14.48 kW for this market, which inflates both the price and the projected savings for a typical home. Our combined install experience averages about 9.5 kW.
Qualifying residential systems of 20 kW or less are exempt from South Carolina property tax. Confirm your own situation with Florence County and a tax professional, since eligibility depends on your circumstances.
About $24,605 installed at $2.59 per watt, then $6,151 over 2 tax years back through the SC credit, for about $18,454 net. It makes about 13,510 kWh a year here unshaded. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.
Half of Florence homes are more than 44 years old, so the roof check matters here: a roof with under ten years left should be replaced before solar goes on, or at the same time. A roof that needs replacing within a few years adds its cost to the project, so we price both together when it does.
It depends on your Duke Energy Progress rate and how much of the 13,510 kWh a year you use at home, so we model it from your bill. Duke Energy Progress households paid about 14.9¢ per kWh on average in 2024.
Nearby
Keep reading
Learn when solar may need panel, service, meter, feeder, or connection work, and what a South Carolina proposal should document before signing.
19 min readLearn how to detect possible solar loan dealer fees by reconciling the cash price, financed amount, APR, itemization, and South Carolina disclosures.
22 min readLearn how to audit measured roof shade, production-model inputs, tree assumptions, layout alternatives, inverter architecture, and the pause decision.
18 min readUse this South Carolina solar site survey checklist to turn roof, shade, electrical, route, land, utility, permit, and HOA findings into a final scope.
20 min readCompare South Carolina solar installers with a transparent shortlist: verify licenses, company roles, contracts, reviews, warranties, and service evidence.
21 min readCompare exact solar panel models by roof fit, electrical design, ratings, certifications, appearance, warranty remedy, substitution, and replacement path.
22 min readFree, no-pressure assessment
We will confirm your utility, measure your roof, read your actual usage history, and give you honest figures, with no guaranteed-savings math and no pressure.
Mon–Sat, 10am–6:30pm ET · We typically follow up within the hour.